Pour-in-Place Concrete Countertops

THREE: DEMOLDING

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Mauris nec tincidunt nulla. Praesent a mauris sed odio rutrum lacinia. Mauris ultricies suscipit metus, nec volutpat nisi rutrum id. Sed tincidunt purus ut felis porttitor tempus. Nulla quis metus eu velit convallis rhoncus. Morbi commodo, ante sit amet semper vulputate, mi nunc mollis urna, sit amet mattis enim quam ac dui. Class aptent taciti sociosqu ad litora torquent per conubia nostra, per inceptos himenaeos. 

What You’ll Need
  • Rubber Gloves
  • Diamond Hand Sanding Pad

Step 1 – Break Away Walls

  • Pull the walls away from the concrete and snap them off.
  • Clean up the edges with diamond hand pads.
  • Continue the finishing process.
Previous: Pouring

140-163 character description of this project phase. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Donec enim ante, luctus eu enim vel, eleif luctus eu

Leave a Reply

Your email address will not be published. Required fields are marked *